|
control enhancementCP-6(2)
Recovery Time and Recovery Point Objectives (CP-6(2))
Configure the alternate storage site to facilitate recovery operations in accordance with recovery time and recovery point objectives.
Security Baselines
HIGHLOWMODERATE
contingencydisaster-recoverybusiness-continuityenhancement
Why These Connect
Enhances1
These enhancements add specific capabilities or refinements to the base control.
Baselined In1
This control is included in the linked security baseline (LOW, MODERATE, or HIGH).